push-shower-mould-customized-from-xiamen-fengjin-injection-factory
Manufacturing Technique:plastic injection mould
Runner:Cold
Mould Core:S136
Mould Base :C50
Cavity:2
Factory Location:Xiamen,China
Supply Capacity: 55-65sets/month
Kep Words:plastic injection mould ,injection molding factory
Fengjin plastic injection molding factory have 3000 square meter.We have three floor working area.First floor have completely full line of mould production include cnc,grinder machine,wire edm, electrosparking and so on .
This is our part of first floor for assemble area for mould.
Plastic mold design refers to the process of creating a mold that is used to shape plastic materials into a desired form. It involves designing the mold structure, creating cavity and core components, and considering factors such as material flow, cooling, and ejection. Here are some key steps in plastic mold design: 1. Product Design: Understand the requirements and specifications of the plastic part that needs to be molded. Consider factors such as dimensions, shape, and functionality. 2. Mold Structure Design: Determine the type of mold required, such as a two-plate mold, three-plate mold, or hot runner mold. Design the mold structure including the parting line, gating system, and ejection system. 3. Cavity and Core Design: Create the cavity and core components of the mold. Consider factors such as draft angles, surface finish, and tolerances to ensure proper plastic flow and easy ejection. 4. Runner and Gate Design: Design the runner system that delivers molten plastic from the injection molding machine to the mold cavity. Determine the gate location and size to control the flow of plastic into the mold. 5. Cooling System Design: Incorporate a cooling system into the mold to control the temperature and solidification of the plastic. Design cooling channels or inserts to ensure uniform cooling and minimize cycle time.
Product Specification:
injection mold manufacturer for bathroom products | |||||||
factory | mould name | mold cavity | mold core | mold base | mold delivery time | shot(times) | circle time(second) |
fengjin | cold runner mold | 2 | S136 | C50 | 50days | 2000000 | 45 |
For mould customized,we can make in a wide range include sanitary,sports,household appliances,car parts and so on.Below are some parts we make for our customer
Beside mold,we also offer ready products as customer request,we can offer products for bathroom and the kitchen.This is our injection area on third floor,inspect and packing the plastic parts and warehouse also in this floor
Hand shower mould is one of our original product,we are super professional on this,we can offer design service and can help customer to double check their drawing before molding,we use S136 as mold core and No.45 # steel for mold base.We make molds for some big company like runner group,solex,moen,kohler,toto,jomoo,schneider and so on.
Normally we'll have 35-45 days for plastic mold production.Step as below :customer offer samples-our designer finish the 3D and send for customer confirmation-start to design the mold -order the steel - CNC processing-electrosparking-assemble the mould-test the injection mould-send plastic parts sample to clients-packing-delivery-customer feedback -new order
Packing by wood crate